EasyManua.ls Logo

Rohde & Schwarz SMC100A - Start Display and Booting the R&S SMC; Switching off

Rohde & Schwarz SMC100A
352 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Putting into Operation R&S SMC100A
1411.4077.62 1.14 E-1
Start Display and Booting the R&S SMC
After instrument switch-on, the Linux operating system boots first and then the instrument firmware.
After booting is completed, the block diagram of the signal generator is displayed. The green lighting
L
ED on the front panel indicates that the instrument is ready to be operated. The settings that were
active before the last switch-off are established unless another start setting has explicitly been selected
in the File menu.
Note:
If the software stops unexpectedly, the instrument can be shut down by pressing the STANDBY key
for approx. 5 s.
Switching Off
1. Press the ON/STANDBY switch on the front panel.
The R&S SMC stores the current setting before it shuts down the Linux
operating system. Then the AC supply is switched to the STANDBY
mode.
2. Only the AC supply is powered.
3. The yellow LED must be on.
CAUTION
Danger of shock hazard!
The instrument is still power-supplied while it is in standby mode.
1. Press the main power switch on the rear of the instrument to
position 0. None of the front-panel LEDs should be on.
Note:
It is recommended to switch the instrument to STANDBY mode before
completely disconnecting it from the AC supply. If the power switch is
set to 0 before the instrument is switched to the standby mode, all
current settings are lost.

Table of Contents

Other manuals for Rohde & Schwarz SMC100A

Related product manuals