EasyManua.ls Logo

Sartorius BioPAT Trace - Page 4

Sartorius BioPAT Trace
137 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4 BioPAT
®
Trace | Multi Trace Operating Instructions
Contents
3.8 Accessories for Sampling Probes ...................................24
3.8.1 Accessories for Dialysis Probe...............................24
3.8.2 Accessories for Dialysis Probe (1st generation,
no integrated Luer-Lock connection) ...................... 25
3.9 Accessories for the BioPAT
®
Trace | Multi Trace.................... 25
4 Design and Function ....................................................26
4.1 Setting Up the Device ............................................. 26
4.2 BioPAT
®
Trace | Multi Trace Measurement Methods............... 29
4.2.1 Dialysis Measuring Method Using the Dialysis Probe ......30
4.3 Conductivity Cell Function .........................................33
4.4 Particle Filter Function............................................. 34
4.5 Diffusion Module Function ........................................ 35
4.6 Dialysis Probe Function............................................ 36
4.7 Enzyme Reactor Function ..........................................37
4.8 Temperature Correction............................................37
5 Transport................................................................38
6 Initial Installation........................................................39
6.1 Setup ..............................................................39
6.1.1 Device Setup ............................................... 39
6.1.2 Tubing Set Connectors on the Device.......................41
6.1.3 Attaching the Tubing Set for the “Dialysis”
Operating Mode ...........................................46
6.1.4 Installing the Tubing Set for the BioPAT
®
Multi Trace.......54
6.1.5 Connection and Removal of the Enzyme Reactor..........54
6.2 Connecting the Dialysis Probe.....................................56
6.2.1 Mounting the Membrane in the Dialysis Probe .............57
6.2.2 Mounting the Membrane for MeasuringMethanol and
Ethanol in the Dialysis Probe ...............................58
6.2.3 Installing the Dialysis Probe into theBioreactor............59
6.2.4 Sterilization of the Dialysis Probe Prior to Connection .....59
6.2.5 Connecting the Dialysis Probe to the Tubing Set............61
6.3 Cleaning the Dialysis Probe and Replacing theMembrane........ 62
6.4 Loading the Software and Network Connection....................63
6.4.1 Troubleshooting............................................66

Table of Contents

Related product manuals