EasyManua.ls Logo

Sartorius BioPAT Trace - Page 4

Sartorius BioPAT Trace
137 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4 BioPAT
®
Trace | Multi Trace Operating Instructions
Contents
3.8 Accessories for Sampling Probes ...................................24
3.8.1 Accessories for Dialysis Probe...............................24
3.8.2 Accessories for Dialysis Probe (1st generation,
no integrated Luer-Lock connection) ...................... 25
3.9 Accessories for the BioPAT
®
Trace | Multi Trace.................... 25
4 Design and Function ....................................................26
4.1 Setting Up the Device ............................................. 26
4.2 BioPAT
®
Trace | Multi Trace Measurement Methods............... 29
4.2.1 Dialysis Measuring Method Using the Dialysis Probe ......30
4.3 Conductivity Cell Function .........................................33
4.4 Particle Filter Function............................................. 34
4.5 Diffusion Module Function ........................................ 35
4.6 Dialysis Probe Function............................................ 36
4.7 Enzyme Reactor Function ..........................................37
4.8 Temperature Correction............................................37
5 Transport................................................................38
6 Initial Installation........................................................39
6.1 Setup ..............................................................39
6.1.1 Device Setup ............................................... 39
6.1.2 Tubing Set Connectors on the Device.......................41
6.1.3 Attaching the Tubing Set for the “Dialysis”
Operating Mode ...........................................46
6.1.4 Installing the Tubing Set for the BioPAT
®
Multi Trace.......54
6.1.5 Connection and Removal of the Enzyme Reactor..........54
6.2 Connecting the Dialysis Probe.....................................56
6.2.1 Mounting the Membrane in the Dialysis Probe .............57
6.2.2 Mounting the Membrane for MeasuringMethanol and
Ethanol in the Dialysis Probe ...............................58
6.2.3 Installing the Dialysis Probe into theBioreactor............59
6.2.4 Sterilization of the Dialysis Probe Prior to Connection .....59
6.2.5 Connecting the Dialysis Probe to the Tubing Set............61
6.3 Cleaning the Dialysis Probe and Replacing theMembrane........ 62
6.4 Loading the Software and Network Connection....................63
6.4.1 Troubleshooting............................................66

Table of Contents

Related product manuals