74 BioPAT
®
Trace | Multi Trace Operating Instructions
Startup
7.2 Decommissioning
t The device can be switched off at any time by pressing the On/off switch.
The calibration and reference values last stored remain in memory for the
next start (see Chapter “8.3.1.1 Connect”, page 84).
If the measuring instrument is not operated for two days (e.g. over the
weekend), the buffer-filled system may remain standing.
t In the event that the device will be out of use for longer periods of time,
the tubing set must be replaced before re-starting operations.
y For decommissioning in the methanol | ethanol operating mode, the
enzyme reactor must be removed and stored at a cool temperature (see
Chapter 6.2 Connecting the Dialysis Probe”, page 56).