70 BioPAT
®
Trace | Multi Trace Operating Instructions
Initial Installation
6.9 Checklist for Starting-up Operation
Work step Function Chapter Page Status
0 Install PC software (only on initial
setup)
6.5 66
Access website of the device 6.4 63ff
Download installation program
63ff
Start installation program 6.5 66
Adjust IP address and subnet
screen
6.4 63
1 Prepare probes 6.2 56ff
Install membrane 57ff
Install probe in reactor (and
sterilize, if necessary)
59ff
2 Prepare transport buffer and
waste container
6.2 and
8.3.9
56|
100
Buffer solution (ready to use) or
dilute salt mixture and prepare
inbottles
6.1.5 54
Prepare waste container with
disinfecting agent, if necessary
8.5.4 112
3 Setup Device Tubing 6.1.2 41ff
Place conductivity cell into recess
and affix with knurled nut
6.2.5 61
Attach diffusion module 6.1.2 41
Insert drip counters 41
For dialysis only: Connect three-
way stopcock (optional)
6.1.3 46