56 BioPAT
®
 Trace | Multi Trace Operating Instructions
  Initial Installation
After installing the enzyme reactor, follow the instructions on the monitor and 
the filling process will continue with the installed enzyme reactor.
NOTICE
For further usage, the enzyme reactor must be removed from the tubing set, 
filled with transport buffer and stored in the refrigerator at 4–8°C.
If air enters into the enzyme reactor, there is the danger of a decrease in the 
capacity of the enzyme reactor resulting in lower sensitivity.
The removal of the reactor is also carried out in “stopped” status (“Device – 
Stop”). The reactor is closed with the red cover caps, placed into the transport 
container and stored at a cool temperature between 4–8°C.
6.2  Connecting the Dialysis Probe
 CAUTION
Erroneous measurements due to improper assembly and installation!
Ensure that the following tasks are carried out with the utmost care. 
Onlyproperly assembled and installed components in perfect condition 
enable a trouble-free working probe.