 Trace | Multi Trace Operating Instructions   57
    Initial Installation 
6.2.1  Mounting the Membrane in the Dialysis Probe
Install a new membrane before every online measurement involving 
bioprocesses with sterile feeds as shown in Figure 14. If this rule is not 
observed, a lack of sterility may jeopardize the entire cultivation process.
2
1
3
4
Fig. 20:  Dialysis membrane assembly 
Pos. Assembly Components
1 Membrane sandwich
2 Probe lunette
3 TORX screws, M3
4 Lower part of the dialysis probe