Initial Installation
Prior to installing the reactor, the tubing set must
be inserted into the BioPAT
®
Trace | Multi Trace
and filled with buffer. Dry setup may reduce the
reactor capacity and should therefore be avoided
under all circumstances. First, start the filling
process to fill the tubing set (see Chapter 7,
page 73).
After all lines have been filled with transport
buffer, a status window opens and prompts you
to install the enzyme reactor (see Figure 19).
Fig. 19: Enzyme reactor installation prompt
In order to install the enzyme reactor, remove it
from the transport container and open the red
cover caps. Afterwards, install it into the intended
location in the tubing set.