EasyManua.ls Logo

Siemens 8DB10 - Page 117

Siemens 8DB10
214 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
864-5091.9 • INSTALLATION AND OPERATING INSTRUCTIONS • 8DB10 • Revision 06 117/214
Installation
Mount solid-insulated bar.
Bolt the pressure ring of the solid-insulated bar together with the busbar housing using
6 bolts M8 x 45 (including washer and spring washer). Tightening torque: 20 Nm.
The solid-insulated bar is disassembled in reverse order: Remove the bolts at the pressure
ring of the solid-insulated bar. Remove the solid-insulated bar and bolt the cover onto
the connection housing.
Fig. 126: Solid-insulated bar
Solid-insulated bar with integrated
pressure ring (
)
Pressure ring
Contact bolt
Sealing ring
Connection cover for solid-insulated bar
Fig. 127: Fixing points for the pressure ring
of the solid-insulated bar
Solid-insulated bar
Pressure ring
Connection cover for solid-insulated bar
Busbar housing

Table of Contents

Related product manuals