864-5091.9 • INSTALLATION AND OPERATING INSTRUCTIONS • 8DB10 • Revision 06 119/214
Installation
Mount solid-insulated bar.
Bolt the pressure ring of the solid-insulated bar together with the busbar housing using
6 bolts M8 x 45 (including washer and spring washer). Tightening torque: 20 Nm.
The solid-insulated bar is disassembled in reverse order: Remove the bolts at the pressure
ring of the solid-insulated bar. Remove the solid-insulated bar and bolt the cover onto
the connection cover.
Fig. 130: Mounting solid-insulated bars
Solid-insulated bar with
integrated pressure ring
Pressure ring
Contact bolt
Connection cover for
solid-insulated bar
Fig. 131: Fixing points for the pressure ring
of the solid-insulated bar
Solid-insulated bar
Pressure ring
Connection cover for solid-insulated bar
Busbar housing