EasyManua.ls Logo

Siemens 8DB10 - Page 121

Siemens 8DB10
214 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
864-5091.9 • INSTALLATION AND OPERATING INSTRUCTIONS • 8DB10 • Revision 06 121/214
Installation
➭ Mount the gas-insulated bar.
➭ Bolt the pressure ring of the gas-insulated bar together with the busbar housing
using 8 bolts M8 x 20. Tightening torque: 20 Nm.
➭ The gas-insulated bar is disassembled in reverse order: Remove the bolts at the pressure ring
of the gas-insulated bar. Remove the gas-insulated bar and bolt the cover onto
the connection housing.
①
Gas-insulated bar
(with integrated pressure ring
② )
②
Pressure ring
③
Sealing ring
④
Connection housing
Fig. 134: Fixing points for the pressure ring
of the gas-insulated bar
①
Gas-insulated bar
②
Pressure ring
③
Connection housing
④
Busbar housing

Table of Contents