EasyManua.ls Logo

Siemens 8DB10 - Page 165

Siemens 8DB10
214 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
864-5091.9 • INSTALLATION AND OPERATING INSTRUCTIONS • 8DB10 • Revision 06 165/214
Operation
Push the emergency operating lever onto the hexagonal shaft for the READY-TO-EARTH
function so that the pin of the hexagonal shaft fits in the slot of the emergency operating
lever.
To switch the the READY-TO-EARTH function of the three-position disconnector to the desired
end position (READY-TO-EARTH or OPEN), perform the following actions:
Turn the emergency operating lever until the position indicator changes to
READY-TO-EARTH or OPEN position.
Remove the emergency operating lever again.
The control gate returns to its initial position.
The opening for the READY-TO-EARTH function is closed.
Switching operations
after emergency
operation
Perform further manual switching operations only with the associated operating levers for
the DISCONNECTING or READY-TO-EARTH functions.
Position of emergency
operating lever
Marking of slot Position of three-position
disconnector
vertical left READY-TO-EARTH
right OPEN

Table of Contents

Related product manuals