EasyManua.ls Logo

Siemens 8DB10 - Page 164

Siemens 8DB10
214 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Operation
164/214 Revision 06 INSTALLATION AND OPERATING INSTRUCTIONS 8DB10 864-5091.9
Emergency operation of
the READY-TO-EARTH
function
If the switch does not reach its end position, e.g., due to a failure of the auxiliary voltage
during earthing switch operation, push the operating lever with pushed-on adapter onto the
hexagonal shaft for the READY-TO-EARTH function in such a way that the pin of the hexagonal
shaft fits in the inner slot of the operating adapter.
Fig. 190: Inserting the operating lever with pushed-on adapter (READY-TO-EARTH function)
Push the control gate to the left.
Push the control gate to the right.
The opening for the READY-TO-EARTH function is free.
ATTENTION
The emergency operating lever with adapter does not have a stop. Switching with the
emergency operating lever beyond the end position of the DISCONNECTING function of the
three-position disconnector will damage the three-position disconnector.
Do not turn the emergency operating lever with adapter beyond the horizontal position.
Fig. 191: Emergency operation of the READY-TO-EARTH function of the three-position disconnector

Table of Contents

Related product manuals