EasyManua.ls Logo

Siemens 8DB10 - Page 197

Siemens 8DB10
214 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
864-5091.9 • INSTALLATION AND OPERATING INSTRUCTIONS • 8DB10 • Revision 06 197/214
Operation
De-earthing the busbar section (system 1)
1
Initial situation
2
Push the right-hand control gate to the right.
3
Switch the three-position disconnector to READY-TO-EARTH position
(insert the operating lever for the READY-TO-EARTH function and turn
180° counter-clockwise).
4
Remove the operating lever for the READY-TO-EARTH function.
The right-hand control gate returns to its initial position.
5
Push the left-hand control gate to the left.
6
Switch the three-position disconnector to OPEN position (insert the
operating lever for the DISCONNECTING function and turn 180°
counter-clockwise).
7
Remove the operating lever for the DISCONNECTING function.
The left-hand control gate returns to its initial position.

Table of Contents

Related product manuals