EasyManua.ls Logo

Siemens CP-8000

Siemens CP-8000
614 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Service
494 Unrestricted SICAM A8000 / CP-8000 • CP-8021 • CP-8022 Manual
DC8-037-2.02, Edition 10.2017
11.2.2 Checks after Startup
Cyclic operation RY ER Error/reaction
Check of the communication connec-
tions
˜ ˜ Communication error
Communication failure
Communication fault
Communication connections set up
(OK)
˜
Function check of the I/O Modules over
the TM bus
˜ ˜ I/O Module error
Periodical information for the open-/closed-
loop control function
Diagnosis information
I/O Modules operational (OK) ˜
Error RY ER Note
Communication failure ˜ ˜
Diagnosis
Check communication lines
Check remote station
Communication error ˜ ˜ Diagnosis
I/O Module error ˜ ˜
Diagnosis
Replace system (if internal module)
Replace I/O Module (if external module)
Load firmware code RY ER Error/reaction
System element is shut down and the
firmware code is loaded from the SD
card
˜ ˜
Initiate startup of the Master Module for
new loaded system elements (protocol
element, I/O Master Module)
˜ ˜
startup completed (OK) ˜
startup completed (error) ˜ ˜

Table of Contents

Other manuals for Siemens CP-8000

Related product manuals