168/617
Building Technologies Division User Manual LMS14... CC1U7471en
6 The settings in detail 07.05.2014
50
45
40
35
30
20
5101518
[Day
]
0
25
55
Fh
Bh
11
57
Fh + Bh
125
Figure 28: Floor curing function
Key
Line no. Meaning
HC1 HC2 HC3
8744 8774 8803 TVw Flow temperature setpoint 1/2/3
Bh Curing heating
Fh Functional heating
X Start day
The temperature change always takes place at midnight. The start day (day 0), that is,
the period of time from activation of the function to midnight, does not count as a
functional day. The setpoint used for the start day is the value of the first functional day.
During Floor curing, the profile temperature (TVEp) is limited within the 2 values Flow
temp setpoint max (TVmax) and Flow temp setpoint min (TVmin).
The function is ended when the functional days have elapsed or when deactivated via
parameterization.