EasyManua.ls Logo

Siemens SIMATIC ET 200eco PN - Page 36

Siemens SIMATIC ET 200eco PN
275 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Wiring
3.5 Wiring the ET 200eco PN
ET 200eco PN
36 Operating Instructions, 08/2016, A5E01250250-AJ
Install ET 200eco PN I/O devices on non-conductive base
Requirements
Non-conductive base for installation of the I/O device.
Tools required
You need the following tools to connect to the functional ground:
Stripping tool
Crimp tool
Screwdriver
Required accessories
You need the following accessories to connect to the functional ground:
M5 x 8 fixing screw and washers
Grounding cable (copper braid cable) with a minimum cross-section of 4 mm
2
Cable lug suitable for M5 screws
Installation
To connect ET 200eco PN I/O devices to functional earth with non-conductive base, follow
these steps:
Drill 2 fixing holes.
Strip the grounding conductor and crimp on the cable lug.
Screw the cable lug onto the I/O device and voltage distributor (M5 fixing screw) with a
torque of 1.5 Nm.
Figure 3-1 Wiring the I/O device to functional earth
Reference
For additional information on installing I/O devices, refer to the section Installing (Page 20).

Table of Contents

Other manuals for Siemens SIMATIC ET 200eco PN

Related product manuals