EasyManua.ls Logo

Siemens SIMATIC ET 200eco PN - Pin Assignment for Feeding and Looping the Voltage

Siemens SIMATIC ET 200eco PN
275 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Wiring
3.6 Pin assignment of connectors
ET 200eco PN
40 Operating Instructions, 08/2016, A5E01250250-AJ
3.6.2
Pin assignment for feeding and looping the voltage
Cable connector for supply voltage infeed, X03 connector
The table below lists the pin assignment for the supply voltage infeed.
Table 3- 2 Pin assignment of the M12 cable connector for the supply voltage infeed
Pin
Assignment
View of the cable connector
(wiring side)
1
Supply voltage 1L+ (non-switched)
2
Ground 2M (switched)
3
Ground 1M (non-switched)
4
Supply voltage 2L+ (switched)
5
Reserved
Cable connector for loop-through of the supply voltage, X02 socket
The following table lists the supply voltage for loop-through of the supply voltage.
Table 3- 3 Pin assignment of the M12 cable connector for loop-through of the voltage
Pin
Assignment
View of the cable connector
(wiring side)
1
Supply voltage 1L+ (non-switched)
2
Ground 2M (switched)
3
Ground 1M (non-switched)
4
Supply voltage 2L+ (switched)
5
Reserved
Note
The M12 sockets for the supply and I/O have the same coding.
Make sure that you wire the supply and the I/O correctly.

Table of Contents

Other manuals for Siemens SIMATIC ET 200eco PN

Related product manuals