SIMPLEX 4100 EWIS Page 71
INSTALLATION MANUAL
Document No.: 4100-M011 March 1998 Issue 1.0
7 COMMISSIONING THE SYSTEM
7.1 COMMISSIONING CHECK LIST
JOB NAME:
JOB NUMBER: ....................................................................................................
PANEL SERIAL NUMBER: ...................................................................................
Please place a tick in the space provided if check is correct. If not please give
details.
Panel Check List
Y N
Cabinet undamaged (no paint chips, door aligned).................................
U U
Power Point fitted and wired correctly. ....................................................
U U
All cabinet earths wired correctly and securely fitted...............................
U U
Battery Capacity...................................................................................... ________
All Print Circuit Boards securely fitted .....................................................
U U
Identification Label Completed ................................................................
U U
Power Up
Y N
Charger output voltage at BATT +27.6VDC (@ 20 deg) .........................
U U
Quiescent panel current from battery (Mains Isolated)............................ ________
Lamp Test OK .........................................................................................
U U
Display LEDs aligned and all intensities similar.......................................
U U
Function keys aligned and operate easily ...............................................
U U