EasyManua.ls Logo

SMA CORE2 - Scope of Delivery

SMA CORE2
222 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3 Scope of Delivery
SMA Solar Technology AG
Replacement Manual STPxxx-60-DC-SPD-RM-xx-11 11
Grounding conductor test prior to recommissioning
Prior to recommissioning SMA inverters after the installation of SMA components or power
assemblies which cannot be replaced intuitively, ensure that the grounding conductor in the
inverter is correctly connected. The function of the grounding conductor must be ensured and
all locally applicable laws, standards and directives must be observed.
Observe superordinate standards
The repair work on devices and the consideration and application of other standards which
correspond to a superordinate standard is the responsibility of the qualified person performing
the work. Unauthorized alterations will void guarantee and warranty claims and in most cases
terminate the operating license. SMA Solar Technology AG shall not be held liable for any
damage caused by such changes.
3 Scope of Delivery
Check the scope of delivery for completeness and any externally visible damage. Contact the
Service if the delivery is incomplete or damaged.
123263-00.01 - Spare Part DC-SPD board STP 110-60
Quantity Designation
1 DC SPD assembly
24
Screw M4 with spring washer and washer
4 Screw M5 with spring washer and washer
1 Replacement Manual
202086-00.01 - SPD Type 1+2 board for STP 110-6x (retrofit kit) und
202757-00.01 - SPD Type 1+2 board for STP 110-6x (spare part)
Quantity Designation
1 DC SPD assembly
24 Screw M4 with spring washer and washer
4 Screw M5 with spring washer and washer
4 PCB bracket
1 Replacement Manual
ENGLISH

Table of Contents

Related product manuals