EasyManua.ls Logo

SolaX Power X3-IES Series - Page 50

SolaX Power X3-IES Series
228 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
42
Preparation before Installation
Two Towers
Option D
Option E
Option F
1281 mm
>300 mm
809 mm
1127 mm
>300 mm
963 mm
>300 mm
1281 mm
1127 mm
Option G
1599 mm
1127 mm
>300 mm
Figure 4-4 Installation options for two towers
Table 4-1 Net weight and dimensions of components
Option
A
Option
B
Option
C
Option D Option E Option F Option G
Left
tower
Right
tower
Left
tower
Right
tower
Left
tower
Right
tower
Left
tower
Right
tower
Inverter 1 1 1 1 / 1 / 1 / 1 /
BMS 1 1 1 1 / 1 / 1 / 1 /
Battery
module(s)
2 3 4 2 2 1 3 2 3 3 3
Base 1 1 1 1 1 1 1 1 1 1 1
Series
box
/ / / / 1 / 1 / 1 / 1
Cover / / / / 1 / 1 / 1 / 1
* A base support (s) is (are) necessary if the wall mounting is selected for all installation
options.

Table of Contents

Related product manuals