R6,Applications
72
Nextstep
Either,pressAsBLT tocheckpointlocationsrelativetoacontructionline.
Or,press Shifttoenteroffsetvaluesforshiftingtheconstructionline.
9.11.3 AsBuiltCheck
Description
TheAsbuiltscreendisplaystheLine,Offsetandd.d.Zofameasuredpointinrelationtothe
constructionline.Theon‐screengraphicsshowthepositionofthemeasuredpointrelativeto
theconstructionline.
)
Theheightofthelinestartpointisalwaysusedasthereferenceheight!
Access
PressAsBLTfromthe LAY OUT screen.
ASBUILTCHECK
Thegraphicsarescaledtogiveabetteroverview.Thereforeitispossiblethatthestationpoint
movesinthegraphics.
AsBLT
ToswitchtoAsBuiltmodetocheckpointsrelativeto
theconstructionline.
Shift
Toentervaluesforshiftingtheline.
Field Description
dLi Longitudinaloffset:Positiveiftargetpointisfurtherawaythanthemeasured
point.
dOf Perpendicularoffset:Positiveiftargetpointistotherightofthemeasuredpoint.
d HG Heightoffset:Positiveiftargetpointishigherthanthemeasuredpoint.
LAYOUT
ToswitchtoLayoutmodetosetoutpoints.
Shift
Toentervaluesforshiftingtheline.
Field Description
dLi Longitudinaloffset:Positiveifmeasuredpointisfurtheralongtheconstruction
linefromthestartpoint.