Innagator | Technical Pack92
CHNT Meter with CT Coil
NOTE:
When the inverter is in the o-grid state, the N line needs to be connected to the earth.
In the nal installation, a breaker certied according to IEC 60947-1 and IEC 60947-2 shall be installed
with the equipment.
Three-Phase Smart Meter
SET ESC
7
2524211917161413
3 96 10
GRID
Parallel_1 Parallel_2Meter
Inverter
L1
L2
L3
N
PE
Grid
AC Breaker
AC Breaker
Home Load
L1
L3
N
PE
L2
CT1
CT2
CT3
RS485A
RS485B
N
L1
L2
L3
Note: the arrow direc�on
towards the inverter
Three-Phase Smart Meter
SET ESC
2524211917161413
3 96 10
CHINT meter
RS 485
CHNT DTSU666
(3,6,9,10)
3 13146 9 10 16171921
Phase B current =5.001A
Phase C current =5.002A
Phase A current =5.000A
L1
L2
L3
PIN 13,16,19:White cable of the CT
PIN 14,17,21: Blue cable of the CT
White line
White line
White line
Blue line
Blue line
Blue line
230/400V,3~
250A/50mA
50/60Hz
STRICTLY, PRIVATE AND CONFIDENTIAL