EasyManua.ls Logo

SunSynk INNAGATOR - CHNT Meter with CT Coil

SunSynk INNAGATOR
186 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Innagator | Technical Pack92
CHNT Meter with CT Coil
NOTE:
When the inverter is in the o-grid state, the N line needs to be connected to the earth.
In the nal installation, a breaker certied according to IEC 60947-1 and IEC 60947-2 shall be installed
with the equipment.
Three-Phase Smart Meter
SET ESC
7
2524211917161413
3 96 10
GRID
Parallel_1 Parallel_2Meter
Inverter
L1
L2
L3
N
PE
Grid
AC Breaker
AC Breaker
Home Load
L1
L3
N
PE
L2
CT1
CT2
CT3
RS485A
RS485B
N
L1
L2
L3
Note: the arrow direcon
towards the inverter
Three-Phase Smart Meter
SET ESC
2524211917161413
3 96 10
CHINT meter
RS 485
CHNT DTSU666
(3,6,9,10)
3 13146 9 10 16171921
Phase B current =5.001A
Phase C current =5.002A
Phase A current =5.000A
L1
L2
L3
PIN 13,16,19White cable of the CT
PIN 14,17,21: Blue cable of the CT
White line
White line
White line
Blue line
Blue line
Blue line
230/400V,3~
250A/50mA
50/60Hz
STRICTLY, PRIVATE AND CONFIDENTIAL

Table of Contents