EasyManua.ls Logo

Suzuki Ozark - Engine Installation

Suzuki Ozark
374 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3-8 ENGINE
ENGINE INSTALLATION
Remount the engine in the reverse order of engine removal.
Pay attention to the following points:
NOTE:
* The engine mounting nuts are self-locking.
* Once the nut has been removed, it is no longer of any use. Be
sure to use new nuts, and then tighten them to the specified
torque.
Engage the secondary driven gear shaft to the universal joint.
ITEM N·m kgf-m lb-ft
A 23 2.3 16.5
B 55 5.5 40.0
 C 55 5.5 40.0
 D 55 5.5 40.0
"

Table of Contents

Related product manuals