Page 5.3
5.3. FIRST POWER-ON
After completing the installation procedure, the machine is ready for use.
Simply turn the on/off switch from position 0 to position 1.
On power-up the machine performs a self test of the upper and lower assemblies. At the end of this
the machine goes into standby, awaiting a keyboard command.
To check the correct operation of the machine:
• get on the machine;
• begin exercising;
• check that the displayed speed varies accordingly;
• check that the exercise resistance varies when the “+” and “-” keys are pressed, and that the
effort level LEDs turn on and off accordingly;
• put on the heart rate meter and check that the machine correctly reads the heart rate value;