EasyManua.ls Logo

TOMARK Viper SD-4 RTC - Page 48

TOMARK Viper SD-4 RTC
203 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
TOMARK, s.r.o.
Airplane Maintenance Manual
Chapter 05 Inspection and Maintenance
Page 48 Issue: 04.APR 2016
Scheduled Inspection
(50 h)
100 h/
annual
as
specified
Check navigation and strobe light for condition and proper
installation.
Emergency
Revise the Aircraft Emergency Parachute System.
1
Placards (refer to pilot’s operating handbook)
Placards and Decals: Check presence, legibility and security.
Consult AFM for required placards exterior and interior.
Finish
Inspect all aircraft compartments for foreign objects, tools
etc.
2
Reinstall (as applicable):
Aerodynamic fairings
Note: If specific work involved opening/closing of oil, coolant
or fuel system related hose connections, it is advised to
execute a short ground run without cowling to check for
leaks.
2
Check seat belt routing
2
Check control system operation.
2
Reattach ignition leads to spark plugs if removed. Reattach air
box hose if bottom cowling was removed.
2
Ground Run
Perform engine ground run (without upper cowling) according
to ROTAX 912 Line Maintenance and Operators Manuals.
Observe the following when performing an engine test run:
2
Check general conditions and power plant start behaviour
2
Check pressures, temperatures, acceleration performance
2
1
At latest after 6 years
2
First 25 hours of operation for new or overhauled engine

Table of Contents