DHCP Configuration • 37, 80, 99
Diagnostics • 160
Dimensions • 23
Disconnecting PIM from the link mode • 216
Disconnecting WA Series Locks from the link
mode • 219
Disconnecting WRI from the link mode • 217
Discovery and Configuration Tool • 235
Download ENGAGE App • 173, 197
E
E Locks w/ ENGAGE Technology • 175
Electrical Wiring Considerations • 18
Enclosure • 114, 124, 134
Enclosure Installation • 25
Environmental conditions • 50, 66, 75, 95, 115,
125, 135
Environmental Consideration • 19
Errors When Logging In or Saving Records to
the Database • 235
F
Factory Reset and Power down • 107
Features • 25, 48, 49, 58, 65, 74, 94, 114, 124,
134, 141, 145
Firmware Designation • 13
G
Gateway (GWE - ENGAGE) • 169, 193
GWE – ENGAGE Gateway Wiring Instructions
• 171, 196
GWE – ENGAGE Gateway, NDE Lock and
SMS Addressing • 172, 196
H
Hardware Not UL Evaluated • 12
Highlights • 23, 48, 58, 65, 74, 94, 113, 123, 133
Hours of Technical Support • 17
How this book is organized • 16
I
Installation and Configuration Steps • 24
Installing Diode for Lock Wiring - Relay • 56,
90, 111, 122, 132
Installing Microsoft Java Virtual Machine • 213
Installing the CDT software • 213
Internet Options • 214
J
J-15 – Read head voltage selector • 138
J2 – Reader Interface Addressing • 116, 126
J3 – On Board Tamper Connection • 116, 126
J4 – RS485 Communication Line Terminator •
116, 126
L
LE Series Wireless Locks • 194
Link LE Locks to GWE – ENGAGE Gateway •
197
Link NDE Locks to GWE – ENGAGE Gateway
• 179
Linking and addressing locks to the PIM • 212
Linking/Addressing • 159
Log In to SUS • 155
M
Magnetic Stripe Reader • 56, 63, 72, 89, 110,
121, 131
Mounting • 66, 75, 95
N
NDE Series Wireless Locks • 170, 172
O
Operation Testing and Maintenance • 14
Optional - Powering Directly From a Power
Supply • 128
Optional - Powering SBB-RI Directly From a
Power Supply • 69