Figure 3.1 Moving the Cabinet (Cabinet Front)
3.3 Tools
WARNING! Risk of electric shock and hazardous voltage. Can cause personal injury or death. The Installation
tools under live operation must be insulated. The tools listed in Table 3.1 below are for reference only. For
onsite installation and connection, use the actual required tools.
Name Drawing Name Drawing
Electric hand drill Adjustable wrench
Slotted screwdriver
Cross head
screwdriver
Stepladder Forklift
Table 3.1 Tools
22 Proprietary and Confidential ©2023 Vertiv Group Corp. 3 Mechanical Installation
Vertiv™ Liebert® APM2 30 to 120 kVA Modular UPS User Manual