EasyManua.ls Logo

Vertiv Liebert STS2/PDU - Figure 38 Installation Drawing, Seismic Floor Stand 800-1000 A

Vertiv Liebert STS2/PDU
144 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Vertiv | Liebert
®
STS2
100-1000A, 50/60Hz User Manual | Rev. 12 | 11/2017 51
Figure 38 Installation drawing, seismic floor stand 800-1000A
Front
Front
Rear
Rear
Rear
Front
Front Upper
Liebert STS2
Bracket
DETAIL C
Front
Front Upper
Liebert STS2 Bracket
Rear Lower
Liebert STS2 Bracket
Rear Upper
Liebert STS2 Bracket
FIGURE 1
Bottom of Liebert STS2
with Upper Brackets
FIGURE 3
Top of Floor Stand
with Lower Rear Mounting Bracket
FIGURE 2
Right Side of Liebert STS2
with Upper Brackets
FIGURE 4
Right Side of Floor Stand
with Lower Rear Mounting Bracket
PS217001
Rev. 2
Rear
Side
2 Places
Cap Screw M12-1.75x40mm
M12 Split Lock Washer
M12 Flat Washer
See Detail C
2 Places
Cap Screw M12-1.75x40mm
M12 Split Lock Washer
M12 Flat Washer
3 Places
Cap Screw M12-1.75x40mm
M12 Split Lock Washer
M12 Flat Washer
Rear Upper
Liebert STS2
Bracket
Leveling
Foot
Nut
Leveling
Foot
Rear Lower
Bracket
See Drawings PS217000, PS217002
and PS217003 for details.

Table of Contents

Related product manuals