EasyManua.ls Logo

ABB AC 800M

ABB AC 800M
260 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Appendix A Troubleshooting EDS File
232 9ARD000014-600 A
32 The value of the
'size' field in the
Producing
Connection Entry is
invalid. Please
retry with a valid
EDS file.
Size field of
producing
connection in EDS
file has an invalid
entry
DeviceNet Import will abort.
Contact the vendor to
get device EDS files
with all the valid
entries.
33 The value of the
'Number of
Significant bits'
field in the
Producing
Connection Entry is
invalid. Please
retry with a valid
EDS file.
Number of
significant bits field
of producing
connection in IO
info section of EDS
file has an invalid
entry
DeviceNet Import will abort.
Contact the vendor to
get device EDS files
with all the valid
entries.
34 The 'No. of
significant bits'
field in the
Producing
Connection Entry is
null. Please retry
with a valid EDS
file.
Number of
significant bits field
of producing
connection in IO
info section of EDS
file is empty
DeviceNet Import will abort.
Contact the vendor to
get device EDS files
with all the mandatory
fields with non-empty
entries.
35 The 'Compatible I/O
mask field' field
in the Producing
Connection Entry is
invalid. Please
retry with a valid
EDS file.
Compatible IO
mask field of
producing
connection entry of
IO info section has
an invalid entry
DeviceNet Import will abort.
Contact the vendor to
get device EDS files
with all the valid
entries.
Table 41. Messages - Import of EDS Files (Continued)
Sl
No
Message Reason
Applicability
Based on Device
Classification
Additional
Information and
Workaround

Table of Contents

Other manuals for ABB AC 800M

Related product manuals