EasyManua.ls Logo

ABB ACS580-01 - Page 30

ABB ACS580-01
278 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
30 Operation principle and hardware description
Frame R3
BREAKERS
INPUT
PE
MOTOR
R-
R+
UDC+
L1
L2
L3
T1/U
T2/V
T3/W
1 Mounting points (4 pieces)
2Cover
3Cover screw
4 Control panel
5 Control panel connection
6 Cold configuration connection for CCA-01
7 Power OK and Fault LEDs. See section
LEDs on page 156.
8 I/O connections. See section External
control connection terminals, frames
R1…R5 on page 35.
9 Varistor grounding screw (VAR).
See Checking the compatibility with IT
(ungrounded) and corner-grounded TN
systems on page 91.
10 EMC filter grounding screw (EMC).
See Checking the compatibility with IT
(ungrounded) and corner-grounded TN
systems on page 91.
11 Input power connection (L1, L2, L3),
motor connection (T1/U, T2/V, T3/W) and
brake connection (R-, R+)
12 PE connection (power line)
13 Grounding connection (motor)
14 Additional grounding connection
15 Cable entry
16 Main cooling fan
17 Cable tie mounts for I/O cables
18 Auxiliary cooling fan. For
IP55/UL Type 12 drives only.
19 Auxiliary cooling fan connector
20 Place for storing the removed EMC screw
21 Place for storing the removed VAR screw
5
6
7
8
16
15
1
4
1
2
11
3
PE
R3 IP21
1
12
13
17
19
17
8
20 21
9
10
18
14

Table of Contents

Other manuals for ABB ACS580-01

Related product manuals