46 Mechanical installation
Check the installation site according to the requirements below:
The installation site is sufficiently ventilated or cooled to transfer away the drive
losses. See section Losses, cooling data and noise on page 176.
The operation conditions of the drive meet the specifications given in section
Ambient conditions on page 192.
The wall is as close to vertical as possible, of non-flammable material and strong
enough to carry the weight of the drive, see section Dimensions, weights and free
space requirements on page 173.
The floor/material below the installation is non-flammable.
There is enough free space above and below the drive to enable cooling air flow,
service and maintenance, See the required free space tables for each of the
different mounting alignments on page 44 (or page 173).
Required tools
To install the drive mechanically, you need the following tools:
drill with suitable bits
screwdriver and/or wrench with a set of suitable bits (as appropriate for the
installation hardware used)
tape measure, if you will not be using the provided mounting template.
Moving the drive
Frames R5…R9: Move the transport package by pallet truck to the installation site.