EasyManua.ls Logo

ABB PickMaster Twin - PowerPac - Page 174

ABB PickMaster Twin - PowerPac
454 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4 Click OK.
Tip
If switch failed, the status window will show up.
The Status window is opened.
xx1800001462
Note
If the user meets any problem when building connection between PickMaster
PowerPac and real Runtime, please check from below possible reasons:
1 Using a host account that is not administrator;
2 Firewall blocking;
3 VPN interference;
4 SSH not installed or down or stuck (Occasionally due to computer
environment the SSH.exe cannot be installed successfully);
5 Host IP address incorrect, or not in the same IP segment as the client port.
Select a real controller
Use this procedure to select a real controller:
1 Right-click the Controller in the tree view Cell and select Edit Controller.
xx1800001712
Continues on next page
174 Application manual - PickMaster® Twin - PowerPac
3HAC064218-001 Revision: B
© Copyright 2021 ABB. All rights reserved.
4 Working with PickMaster PowerPac
4.3.1 Switching to real Runtime
Continued

Table of Contents

Related product manuals