EasyManuals Logo

ABB PickMaster Twin - PowerPac User Manual

ABB PickMaster Twin - PowerPac
454 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #206 background imageLoading...
Page #206 background image
xx2100000379
If the estimated error is not ok, this base frame must be re-calibrated:
Move the conveyor belt backward until the reference point is just inside
the working range of the robot. Repeat the steps 10-13 for all the points
Point1, Point 2, Point 3, and Point 4.
If the conveyor belt cannot be moved backward, start over from step
1.
17 If there are more robots to calibrate along the conveyor, continue from step
3.
18 Restart the controllers to activate the new base frames.
206 Application manual - PickMaster® Twin - PowerPac
3HAC064218-001 Revision: B
© Copyright 2021 ABB. All rights reserved.
4 Working with PickMaster PowerPac
4.3.4.4 Defining the base frame (OmniCore)
Continued

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the ABB PickMaster Twin - PowerPac and is the answer not in the manual?

ABB PickMaster Twin - PowerPac Specifications

General IconGeneral
BrandABB
ModelPickMaster Twin - PowerPac
CategoryRobotics
LanguageEnglish

Related product manuals