EasyManua.ls Logo

ABB PickMaster Twin - PowerPac - Page 305

ABB PickMaster Twin - PowerPac
454 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
The Production window is opened.
xx1800001738
2 Select the recipe which will be running.
xx1800001739
3 If need, select the Loop checkbox in the Ghost Picking.
Note
If the Loop checkbox is selected, the ghost picking will repeat sending the
recorded position data to the real controller until the Stop icon is clicked.
If the Loop checkbox is not selected, the ghost picking will send the
recorded position data to the real controller for just one time and stopped
automatically.
Continues on next page
Application manual - PickMaster® Twin - PowerPac 305
3HAC064218-001 Revision: B
© Copyright 2021 ABB. All rights reserved.
4 Working with PickMaster PowerPac
4.5 Ghost Picking
Continued

Table of Contents

Related product manuals