Starting up after
an
unused/storage
period
•
If the operator
uses
the leak detector, after an
unused
or storage
period, there is an additional time at the normal
start-up
time for
outgassing:
-
inactivity period ≤ 10 days + 5
s
maxi (ASM 182, 192,
1
002).
-
10 days < inactivity period ≤ 23 days + 3 min.
-
inactivity period > 23 days + 10 min
-
inactivity period ≤ 10 days + 10
s
maxi
(ASM
142, 142 D,
Graph D +, 122
D
)
.
T
echnical
characteristics A
800/801
•
A
screen informs
the operator in the
start-up
process:
PLEASE WAIT
Storage
days:
Delay (min:s):
ABORT?
PRESS
RESET
Count down of the
additional time
Number of days
since the last
leak detector
switching off
RESET
The
operator can cancelled this additional time by pressing
.
Starting up the leak
detector
Before
starting up the detector
B
400.
Connect
the main power cable of the
detector
to the proper power
outlet.
Turn
main power switch in the ON position
(
B 210)
.
The
indicator lights on the control panel flash.
If your leak
detector
is equipped with «control panel with graphic
interface»
option, please refer to the sheet
C
440 for the mode
choice.
The
following is shown on the
LCD
during 2 seconds.
As soon as the power is ON, the
PLEASE WA
.
I
.
T
.
ALCATEL
ASM ...
...
pumps star
t.
UNIT: mbar.l/s
SOFT:L...v...
r...
Audio
messages
inform the operator
about
starting-up process
during this
one.
•
If leak
detector
auto-calibration is ON
1
•
If leak
detector
auto-calibration is
OFF
2
PLEASE WA
.
I
.
T
.
...
If a printer is
connected,
a calibration ticket is automatically printed at
the end of the calibration: examples
2
,
4
B
320.