EasyManua.ls Logo

Adixen ASM GRAPH D+ - E 750 - Primary pump maintenance

Default Icon
336 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
E
750
Primary pump
maintenance
GB
00239
-
Edition 04
-
December
05
The frequency of preventive
maintenance
is listed D
100
Components:
ALCATEL
200 Oil (1 liter)
Cartridge (Oil mist
eliminator).....................................
F
600
For best
performance,
check the oil level in the sight
glass
periodically
.
Check the oil level of
the roughing
pump
If
the level is not between
the
mini and the maximum level, it is
necessary
to add
oil.
Maxi.
Mini.
Oil for the first utilisation is delivered with the
detecto
r
.
B
110).
Replacement of oil is the users
responsability
.
The Alcatel pumps are tested with
ALCATEL
200 oil.
Their specifications are
guaranteed
only when this
recommended
lubricant is
used.
Add oil
Open
the cover (ASM
142).
Remove the cover (ASM
142 S).
Remove the draining
plugs.
ASM
142
S ASM
142
/3

Table of Contents

Related product manuals