EasyManua.ls Logo

Adixen ASM GRAPH D+ - B 400 - Before starting up the leak detector

Default Icon
336 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
B
400
GB 00218
-
Edition 05
- June
08
Before
starting up the leak detector
Please acquaint oneself
with
the safety instructions sheet (
B
100)
and
the installation sheet (
B
110)
The
performance of the
detector
(pumping speed, accuracy and
reliability) depends on:
-
the
vacuum
connections
-
the
frequency
and quality of maintenance
-
the helium calibration.
Main power
switch
Check
power voltage
Check that the power voltage is compatible
with the power configuration of the leak
detector: check the indications of the label
located close to the power switch.
Check
the oil level
of
the rotary vane pump
(ASM
142 -
The
pump has been drained: a label affixed on the cover of the unit
indicates this and the filling oil is supplied.
ASM 142
S)
NOTICE
PUMP IS SHIPPED
WITHOUT
OIL
INST
ALLED
consult
maintenance manual
CAUTION
A
TTENTION
POMPE LIVREE SANS HUILE
A
L
’INTERIEUR
consulter le manuel
d’utilisation
A
TTENTION
Recto Verso
Maintenance
of the primary pump
E
750
The
pump will be damaged if it runs without
oil.
(> 5 mn).
The
oil required for the first
use
is supplied with the detector.
Replacement
of oil is the
user
s
responsability.
The
pumps have been
tested
with A200
oil.
The technical characteristics
of the pump are
guaranteed only with the
recommended
oil.
Installation
Position
the unit so there is no possible risk of it falling or tilting.
1/
1

Table of Contents

Related product manuals