EasyManua.ls Logo

Asyst Technologies VersaPort 2200 - Post-Service

Default Icon
288 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Page 106 2000-1252-01 Released Rev. C
VersaPort 2200 Technical Manual
Chapter 4: Service
CSP2 – Pod Door Lock Motor Replacement
a
_____d. From the Manual menu select F6 (DC MOTOR). Use the arrow keys to
select Unlock Port and press Enter.
_____20. Place a Pod on the port plate and test the lock/unlock sequence following ISIM
commands in Step 14. If door locks properly, proceed. If ISIM errors are
encountered, repeat necessary adjustments.
_____21. Ensure pod door is in Unlock position. Remove Pod from the VersaPort.
Remove PC null modem cable connection. Remove 24vdc power.
Post-Service
_____1. If necessary, return the VersaPort to the Process Tool.
_____2. Reinstall the minienvironment shield.
_____3. The procedure is complete when the VersaPort has been remounted to the
Process Tool—with the minienvironment reinstalled—and has been
Autocycled ten times.

Table of Contents