EasyManua.ls Logo

Basler BE1-11g - Page 528

Basler BE1-11g
672 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
516 9424200994 Rev N
voltage of 69.28 Vpn, 0°, to terminals C17 (Vx-phase) and C18 (Vx-neutral). The 25A Slip Diff
digital point should be true.
Step 3: Slowly increase the frequency of the phase voltage source until the 25A Slip Diff digital point
turns off. This should occur at 60.506 Hz ±0.01 Hz. Record the results.
Step 4: Decrease the frequency of the phase voltage source until the 25A Slip Diff digital point turns on.
Step 5: Slowly decrease the frequency of the phase voltage source until the 25A Slip Diff digital point
turns off. This should happen at 59.494 Hz ±0.01 Hz.
Step 6: (Optional.) Repeat steps 2 through 5 for settings group 1, 2, and 3.
Breaker Close Angle Verification
Step 1: Use BESTCOMSPlus to monitor the status of OUT6 or the 25A Angle Diff digital point in
Metering Explorer, Status, Digital Points (1536-1567).
Step 2: Connect a balanced, three-phase voltage source of 69.28 Vpn, 60 Hz to BE1-11g terminals C13
(A-phase), C14 (B-phase), C15 (C-phase), and C16 (neutral). Apply a single-phase, 60-hertz
voltage of 69.28 Vpn, 0°, to terminals C17 (Vx-phase) and C18 (Vx-neutral). OUT6 should
close and the 25A Angle Diff digital point should light.
Step 3: Slowly increase the angle of the phase voltage source until OUT6 opens or the 25A Angle Diff
digital point turns off. For phase A, this should occur at +20.1° ±1°. Record the result.
Step 4: Decrease the angle of the phase voltage source until OUT6 closes or the 25A Angle Diff turns
on.
Step 5: Slowly decrease the angle of the phase voltage source until the 25A Angle Diff turns off. For
phase A, this should occur at 20.1° ±1°. Record the result.
Step 6: (Optional.) Repeat steps 2 through 5 for settings group 1, 2, and 3.
Voltage Source > Voltage Destination Verification
Step 1: Use BESTCOMSPlus to monitor the status of OUT6.
Step 2: Connect a balanced, three-phase voltage source of 69.28 Vpn, 60 Hz to BE1-11g terminals C13
(A-phase), C14 (B-phase), C15 (C-phase), and C16 (neutral). Apply a single-phase, 60-hertz
voltage of 69.28 Vpn, 0°, to terminals C17 (Vx-phase) and C18 (Vx-neutral). OUT6 should
remain open.
Step 3: Slowly increase the phase voltage source until OUT6 closes. This should occur at 69.28 V +
(0.5% = 69.63 V) ±1 V.
Step 4: (Optional.) Repeat steps 2 and 3 for settings group 1, 2, and 3.
Voltage Raise/Lower Continuous Output Verification
Step 1: Use BESTCOMSPlus to monitor the status of OUT4 (Lower) and OUT5 (Raise).
Step 2: Connect a balanced, three-phase voltage source of 69.28 Vpn, 60 Hz to BE1-11g terminals C13
(A-phase), C14 (B-phase), C15 (C-phase), and C16 (neutral). Apply a single-phase, 60-hertz
voltage of 69.28 Vpn, 0°, to terminals C17 (Vx-phase) and C18 (Vx-neutral). OUT4 and OUT5
should be open.
Step 3: Slowly increase the phase voltage source until OUT4 closes continuously. This should occur
when the source differs from the ΔV setting by 1% (approximately 69.98 V ±1 V).
Step 4: Decrease the phase voltage source until OUT4 opens.
Step 5: Slowly decrease the phase voltage source until OUT5 closes. This should occur when the
source differs from the ΔV setting by 1% (approximately 68.58 V ±1 V).
Step 6: (Optional.) Repeat steps 2 through 5 for settings group 1, 2, and 3.
Synchronizer (25A) Test BE1-11g

Table of Contents

Related product manuals