07-19-B1-729 FLO-GARD 6301 DUAL CHANNEL VOLUMETRIC INFUSION PUMP SERVICE MANUAL 10-1
Chapter 10
Chapter 10 Operational Checkout
Overview
The operational checkout procedures in this chapter determine that the pump
operates properly after it has been repaired or as preventive maintenance.
When the pump fails any part of the operational checkout, the fault must be
corrected prior to placing the pump in service. Please become familiar with all
the checkout procedures before beginning.
As part of a thorough checkout, verify the calibration values as indicated in
Chapter 9, “Calibration”.
The following test equipment is required to perform the operational checkout
procedures:
Q Baxter Continu-Flo “s” suffix administration set with at least one
Y- si te
Q Secondary administration set
Q Solution containers (such as distilled/sterile water)
Q Precision gas-tight 250 μL syringe (Hamilton #1725 or equivalent)
Q Thickness gauge (part no. UKOG1013.B)
Q Tape measure or yardstick
Q Calibrated scale with 0.1 g resolution or better
Q ASTM class A graduated cylinder, 25 mL or larger, depending on test
(optional)
Q Calibrated pipetter, 1000 μL (optional)
Q Calibrated safety analyzer, Dale Technology LT544D or equivalent
Appendix A, “Operational Checkout Data Sheet” is a data sheet which may be
reproduced and used to record the results of the Operational Checkout and
calibration procedures. Use Appendix B, “Calibration Verification Data
Sheet” to record the pump’s configuration settings.