07-19-B1-729 FLO-GARD 6301 DUAL CHANNEL VOLUMETRIC INFUSION PUMP SERVICE MANUAL 8-11
Removal/Replacement Procedures Disassembly/Reassembly
9. Press the door latch in toward the pump door so that the spring is
compressed.
10. Install 4 mm washer (Figure 11-5 or Figure 11-10 , item 7) onto the pin.
11. Install the E-ring (Figure 11-5 or Figure 11-10 , item 5) onto the pin.
12. Calibrate in accordance with “Air Sensor Calibration” on page 9-6
through “Upstream Occlusion Sensor Calibration” on page 9-10.
13. Perform the Operational Checkout procedures in Chapter 10,
“Operational Checkout”.
Replacement of the Pump Door or Pump Door Assembly
1. Remove the pump door cover in accordance with “Replacement of Pump
Head Door Cover” on page 8-9.
2. Remove the two set screws (Figure 11-5 or Figure 11-10 , item 29)
3. Slide the hinge pins (Figure 11-5 or Figure 11-10 , item 14) toward each
other and remove the door.
4. Install the replacement door or door assembly in reverse order. Note the
alignment of the hinge pins and make sure that the tapered ends are
pointed toward each other.
5. Install door hinge pin set screws (Figure 11-5 or Figure 11-10 , item 29).
6. Calibrate in accordance with “DC Line Voltage Calibration” on page 9-1
through “Upstream Occlusion Sensor Calibration” on page 9-10.
7. Perform the Operational Checkout procedures in Chapter 10,
“Operational Checkout”.
Replacement of Door Latch Pin
1. Remove one screw (Figure 11-6 or Figure 11-16 , item 15) that secures
the latch pin mounting block to the pump head base plate.
2. Install replacement door latch pin and secure with 1 screw. Tightening
torque is 7 kgf-cm (6.1 in-lb).
3. Calibrate in accordance with “DC Line Voltage Calibration” on page 9-1
through “Downstream Occlusion Sensor Calibration” on page 9-8.
4. Perform the Operational Checkout procedures in Chapter 10,
“Operational Checkout”.