07-19-B1-729 FLO-GARD 6301 DUAL CHANNEL VOLUMETRIC INFUSION PUMP SERVICE MANUAL 3-1
Chapter 3
Chapter 3 Preparation for Use
Overview
This chapter provides information about putting pumps into service.
Unpacking Instructions
Open the shipping carton. Take the pump out of the box and remove the
plastic bag. Keep the packaging materials to re-use if the pump has to be
shipped. To order additional packaging materials, see Chapter 11 for part
number information.
The Operator’s Manual (and any Operator’s Manual addenda included with
the pump) should be forwarded to the appropriate care area where the pump is
to be used.
Inspect the pump for signs of damage incurred during shipment. If you find
any damage, notify the shipping company immediately.
Factory Testing
The tests listed below were performed at the factory.
Q Functional Inspection 1
• LCD/LED Inspection
• Main and backup lithium battery current
• Battery low (alarm/alert)
• Vo l ta g e
• Internal inspection
• Set time and date