EasyManua.ls Logo

baxter Flo-Gard 6301 - Page 46

baxter Flo-Gard 6301
252 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6 Preventive Maintenance
6-4 FLO-GARD 6301 DUAL CHANNEL VOLUMETRIC INFUSION PUMP SERVICE MANUAL 07-19-B1-729
Schedule: Every 12 months or as required
Back plate and safety clamp When the safety clamp or back plate
does not operate smoothly, clean or
replace in accordance with
“Replacement of Safety/Slide Clamp
Assembly” on page 8-19 or
“Replacement of Back Plate” on page
8-23.
Door latch area Remove pump head door cover in
accordance with “Replacement of
Pump Head Door Cover” on page 8-9.
If Latch is cracked or loose replace in
accordance with “Replacement of
Pump Door Latch” on page 8-10.
If door is cracked in Latch area replace
in accordance with “Replacement of
the Pump Door or Pump Door
Assembly” on page 8-11.
Pole clamp When operation is not smooth, apply
one drop of high grade general purpose
machine oil to the screw threads.
Power cord Replace power cord when the pins are
bent or the insulation is damaged.
Preventive maintenance tests Perform the tests detailed in Chapter
10, “Operational Checkout”.
Perform the calibration verifications
described in “Automatic Test Mode 1:
Calibration Mode 1” on page 9-14 and
“Automatic Test Mode 2: Calibration
Mode 2” on page 9-16.
Schedule: Every 6 months or as required
Battery check Perform the Battery Check described
in Chapter 10, “Operational Checkout”
every 6 months after the first year
following battery installation/
replacement.
Table 6-2 Preventive Maintenance Procedures — continued
Check Action

Table of Contents

Other manuals for baxter Flo-Gard 6301

Related product manuals