Capstone Turbine Corporation • 16640 Stagg Street • Van Nuys • CA 91406 • USA
Installation Guide: Capstone C1000S/C800S/C600S with C1000 Series Controller
480064 Rev C (December 2018) Page 13 of 122
Capstone reserves the right to change or modify, without notice, the design, specifications, and/or contents of this document without
incurring any obligation either with respect to equipment previously sold or in the process of construction.
1.2. Referenced Documents
Table 1 presents a list of Capstone documents referenced in this Installation Guide.
Table 1. Referenced Documents
Signature Series Product Specification
C1000S Product Specification
Capstone MicroTurbine Fuel Requirements Technical Reference
CRMS Maintenance Edition Technical Reference
Capstone MicroTurbine Systems Emissions Technical Reference
Dual Mode System Controller Technical Reference
C1000S/C800S/C600S Technical Reference
Grid Interconnect Technical Reference
Liquid Fuel Application Guide
High Humidity Application Guide
Raw Natural Gas Application Guide
C1000S Inlet Hood Installation Guide
C1000S Latch and Striker Plate Installation Guide
C1000S Exhaust Rain Cap Installation Guide
Main Battery Replacement - Capstone Model C200/C1000 Series
Desiccant Kit Replacement Work Instruction
Locked Rotor Identification Work Instruction
Capstone C1000 Signature Series Microturbine Standard Maintenance Schedule
New System Condition Report