Installation Guide: Capstone C1000S/C800S/C600S with C1000 Series Controller
480064 Rev C (December 2018) Page 22 of 122
Capstone reserves the right to change or modify, without notice, the design, specifications, and/or contents of this document without
incurring any obligation either with respect to equipment previously sold or in the process of construction.
2.4. Assembly
Before operation, the following components must be installed on the C1000S/C800S/C600S
enclosure:
Door latches and striker plates. Refer to the C1000S Latch and Striker Plate Installation
Guide (Table 1).
Exhaust flappers. Refer to the C1000S Exhaust Rain Cap Installation Guide (Table 1).
Air inlet hood assemblies. Refer to the C1000S Inlet Hood Installation Guide (Table 1).

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Capstone Microturbine C1000 Series and is the answer not in the manual?

Capstone Microturbine C1000 Series Specifications

General IconGeneral
BrandCapstone
ModelMicroturbine C1000 Series
CategoryController
LanguageEnglish