EasyManua.ls Logo

Capstone Microturbine C1000 Series - 4. Customer Connections

Capstone Microturbine C1000 Series
122 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Capstone Turbine Corporation • 16640 Stagg Street • Van Nuys • CA 91406 • USA
Installation Guide: Capstone C1000S/C800S/C600S with C1000 Series Controller
480064 Rev C (December 2018) Page 29 of 122
Capstone reserves the right to change or modify, without notice, the design, specifications, and/or contents of this document without
incurring any obligation either with respect to equipment previously sold or in the process of construction.
4. Customer Connections
See Figure 5 for the location of the customer connections to the C1000S/C800S/C600S
microturbine.
Figure 5. C1000S/C800S/C600S Connections
Fuel
Connection
Phase C (L3)
Bus Bar
Main Circuit
Breakers
(5 Places)
Controller
Connections
Phase B (L2)
Bus Bar
Phase A (L1)
Bus Bar
Neutral (N)
Bus Bar
Floor Access
for Controller
Cables (see
Figure 9)
Floor Access for
Power Cables
(see Figure 9)
Exhaust
Connection
(5 Places)
Controller
Junction Box
High Humidity
Junction Box
Ground
Bus Bar

Table of Contents