EasyManua.ls Logo

Cisco SCE8000 GBE - Organization

Cisco SCE8000 GBE
176 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
xiii
Cisco SCE8000 GBE Installation and Configuration Guide
OL-19897-02
About this Guide
Organization
The major sections of this guide are as follows:
Table 2 Document Organization
Chapter Title Description
1 Cisco Service Control Overview, page 1-1 This chapter provides a brief introduction to
Cisco Service Control.
2 Introduction to the Cisco SCE8000 GBE
Platform, page 2-1
This chapter provides a hardware overview of
the SCE8000 GBE platform.
3 Cisco SCE8000 GBE Topology and
Topology-Related Parameters, page 3-1
This chapter describes the possible
deployment topologies of the SCE8000 GBE
and explains how various aspects of the
topology determine the configuration of the
system.
4 Installing the Cisco SCE8000 GBE Chassis,
page 4-1
This chapter explains how to install a
SCE8000 GBE platform in the rack and
properly ground it.
5 Connecting the Management Interfaces,
page 5-1
This chapter explains how to connect the
SCE8000 GBE platform to a local console
and perform the initial system configuration
via the setup wizard that runs automatically.
6 Cabling the GBE Line Ports and Completing
the Installation, page 6-1
This chapter provides instructions for cabling
the Gigabit Ethernet ports for both one and
two SCE8000 GBE topologies, and for
configuring Gigabit Ethernet (GBE) interface
parameters. In a topology utilizing two
SCE8000 GBE s (cascade), this includes the
cascade ports as well as the line ports.
7 Basic Cisco SCE8000 GBE Platform
Operations, page 7-1
This chapter describes how to start up the
SCE8000 GBE platform, reboot, and
shutdown. It also describes how to manage
configurations.
8 Troubleshooting, page 8-1 This chapter provides basic system startup
troubleshooting information.
9 Removal and Replacement Procedures,
page 9-1
This chapter explains the procedures for
removing and replacing the power supplies,
fan trays, and other modules.
A CLI Commands to Verify a Successful
Installation, page A-1
This appendix provides a basic
post-installation checklist to verify that the
installation was successful.

Table of Contents

Related product manuals