EasyManua.ls Logo

Cisco SCE8000 GBE - Appendix; CLI Commands to Verify a Successful Installation; Introduction; Basic Post-Installation Checklist

Cisco SCE8000 GBE
176 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
A-1
Cisco SCE8000 GBE Installation and Configuration Guide
OL-19897-02
APPENDIX
A
CLI Commands to Verify a Successful Installation
Revised: August 23, 2010, OL-19897-02
Introduction
When you have completed the installation of your Cisco SCE8000 GBE platform, we recommend that
you run a number of CLI commands to verify that the proper components have been successfully
installed and are operational.
Basic Post-Installation Checklist
The following table provides a basic post-installation checklist with the related CLI commands. Further
verification of the system configuration would depend on the specific topology and configuration of the
installation, but this list will verify that the basic installation is operational.
Refer to the descriptions of the individual commands for samples of the command output. Relevant
information in the output is in bold.
To check this: Use this command: Comments
version show version Check the following:
firmware version
application version
management agent status
management agent version
optics show inventory In the physical inventory of the SCE platform, verify that the
installed optics are supported by the interfaces.
port configuration show interface Run this command for each port to get a listing of the status
and configuration of all ports.
operational status show system operational status Status should be operational.
This command will give you an indication of problems such
as a power problem or external bypass not configured
properly.
linecard status show interface linecard It should not be shutdown or silent.

Table of Contents

Related product manuals