CHAPTER
4-1
Cisco SCE8000 GBE Installation and Configuration Guide
OL-19897-02
4
Installing the Cisco SCE8000 GBE Chassis
Revised: August 23, 2010, OL-19897-02
Introduction
This chapter describes how to install a Cisco SCE8000 GBE chassis.
Warning
Before you install, operate, or service the system, read the Regulatory Compliance and Safety
Information for the Cisco SCE8000 GBE Platform. This guide contains important safety information you
should know before working with the system.
Warning
Only trained and qualified personnel should be allowed to install, replace, or service this equipment.
Warning
Before working on a chassis or working near power supplies, unplug the power cord on AC units;
disconnect the power at the circuit breaker on DC units.
Warning
The plug-socket combination must be accessible at all times because it serves as the main
disconnecting device.
Warning
This unit is intended for installation in restricted access areas. A restricted access area can be
accessed only through the use of a special tool, lock and key, or other means of security.
Warning
There is the danger of explosion if the battery is replaced incorrectly. The battery is not a
user-serviceable part.
Warning
Class 1 laser product.