EasyManua.ls Logo

Cisco SCE8000 GBE - Page 175

Cisco SCE8000 GBE
176 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
A-9
Cisco SCE8000 GBE Installation and Configuration Guide
OL-19897-02
Appendix A CLI Commands to Verify a Successful Installation
Basic Post-Installation Checklist
show interface linecard subscriber sm-connection-failure
If working with the Subscriber Manager, use this command to make sure the connection with the SM is
established
SCE>show interface linecard 0 subscriber sm-connection-failure
Current SM link state: up.
Configured action to take when SM link is down: No action.
Changing of system operational-status to 'warning' when SM link is down: enabled.
show ip rpc-adapter sessions
If working with the Quota Manager, use this command to make sure the connection with the QM is
established
sce>show ip rpc-adapter sessions
client-name=usr.SM
client-address=/10.240.59.36
started=Mon Apr 06 12:43:01 GMT-04:00 2009
received-message-num=408790
sent-message-num=237292
sent-notifications-num=0
dropped-notifications-num=0
client-username=null
client-name=mcn.SM
client-address=/10.240.59.36
started=Mon Apr 06 12:43:02 GMT-04:00 2009
received-message-num=5715112
sent-message-num=6101181
sent-notifications-num=386768
dropped-notifications-num=0
client-username=null
client-name=mcn.QuotaManager-10.248.64.119_10.240.59.36_SCE.J.API.PRPC
client-address=/10.240.59.36
started=Mon Apr 06 12:43:03 GMT-04:00 2009
received-message-num=404194
sent-message-num=232248
sent-notifications-num=0
dropped-notifications-num=0
client-username=null

Table of Contents

Related product manuals